Phase 1 of the Mandvi facility is commissioning in 2026. The plant is laid out as a single unidirectional flow — cells enter the east bay, packs leave the west, containers are dressed in the dispatch yard.
FIG. B — FACILITY PLAN · NOT TO SCALE
002 / PLANT VITALS
What the line actually does.
Floor area
18,400 m²
Mandvi, Surat · Phase 1
Annual capacity
5 GWh
Phase 1 · 2026
Stations
17
Single unidirectional flow
Takt time
42 sec / cell
Cell intake → tested
First-pass yield
99.7%
Cell + Module + Pack EOL
Cell-to-container
<11 h
Floor-to-FAT
Manpower
240 (Phase 1)
Skilled operators + technicians
Automation
Class IV
17/17 stations · zero manual handling
003 / QUALITY · CERTIFICATION · SUPPLY
Tested, verified, and sourced.
01 · IN-LINE TEST GATES
Cell EOL
Voltage, IR, capacity, dimensional. 100% of incoming cells. Out-of-spec cells return to supplier.
Module EOL
DCIR, hipot at 2.5 kVAC, thermal balance, BMS handshake. 100% of modules.
Pack EOL
Full capacity cycle, balancing, communication test, fire-suppression valve test.
Rack hipot
2.5 kVAC, 1 minute, < 1 mA leakage. Pyro-fuse continuity.
We're transparent about the BoM. Cells are imported from a Tier-1 LFP supplier and IR-tested in-house before they enter the line. Everything else — BMS, thermal, structural, BoM — is sourced from India where viable, with a 65% Make-in-India ratio targeted by 2027.
LFP cells (314 Ah)
Tier-1 imported · IR-tested in-house
Imported
BMS + EMS
Indian engineering partner · firmware in-house
India
Pack frame & enclosures
Sheet-metal partners (Gujarat, Maharashtra)
India
Liquid cooling system
OEM partner with Indian assembly
India
Container & HVAC
Indian fabricator · ISO 1496-1 certified
India
Fire suppression
Aerosol (main) + water (aux) + dry pipe; smoke, temperature & H₂ detection